Mine and Plant Site Aggregate Stockpiles

Sanborn was contracted to perform volumetric calculations for fifty-two on-site piles at a facility located in the Southeast United States. This project’s scope of work included flight planning, ground survey, imagery acquisition, and imagery QC required to produce planimetric grade data at 3” pixel resolution. 3D stereo compilation processes were applied in order to create comprehensive volumetric calculations along with planimetric maps of the site. The sample imagery included here illustrates the change in size of aggregate piles (#40 and #41) over the course of a year.

2013 STOCKPILES

Stockpile #40 – 2013
Total Cut: 6420.105 Cubic Yd.
Total Fill: 0.000 Cubic Yd.
Area: 3221.589 Sq. Yd.
Balance: 6420.105 Cubic Yd.

Stockpile #41 – 2013
Total Cut: 19505.137 Cubic Yd.
Total Fill: 0.003 Cubic Yd.
Area: 4410.170 Sq. Yd.
Balance: 19505.134 Cubic Yd.

Volumetric 2 2013
Volumetric 1 2013
Volumetric 3 in 2013

2014 STOCKPILES

Stockpile #40 – 2014
Total Cut: 20842.005 Cubic Yd.
Total Fill: 0.005 Cubic Yd.
Area: 5290.842 Sq. Yd.
Balance: 20842.000 Cubic Yd.

Stockpile #41 – 2014
Total Cut: 16971.558 Cubic Yd.
Total Fill: 0.006 Cubic Yd.
Area: 4187.036 Sq. Yd.
Balance: 16971.552 Cubic Yd.